🔎 Statistical Process Control (SPC):
how to control industrial process quality and stability
⏩ From product control to process control
Controlling process quality is not just about checking how many parts meet specifications at the end of the line. To understand why a process changes, whether its behavior is stable and whether it can remain within tolerances, we also need to analyze how its variability evolves.
In this two-part series, we will address this question from two complementary perspectives. In this first part, we will explain Statistical Process Control (SPC), common and special causes of variation, control charts, and the difference between stability and capability. In the second part, we will explore the main process capability and performance KPIs: Cp, Cpk, Pp and Ppk.
These indicators complement the product quality KPIs we have already discussed: FTQ, rejection rate, scrap, rework and Final Yield. They all answer any production manager’s most direct question: are we manufacturing correctly? And they are essential indicators, but they have a limitation: they tell us what is happening, not why.
When FTQ falls steadily, scrap rises for no apparent reason or rework becomes recurrent at the same stage of the process, the answer lies not only in the output data, but also in the process itself: its variability, its centring relative to the specifications, and its behavior over time.
This is where SPC comes in.
📐 What is Statistical Process Control (SPC)?
SPC (Statistical Process Control) is a methodological framework for managing process quality proactively through data. It was developed from the work of Walter Shewhart and later widely adopted in industry through W. Edwards Deming. Today, its principles are widely used in quality systems and process improvement.
SPC starts from a basic principle: every production process has variability. Even when a machine is working correctly, two consecutive parts are not absolutely identical.
Some of this variability comes from common causes: the natural variation generated by the production system itself while it operates in a stable manner. Although it cannot be eliminated completely, it can be measured and reduced through process improvements.
Some may be due to special causes: changes or events that alter the process’s usual behavior, such as a damaged tool, an abnormal batch of material or an incorrect parameter change. SPC helps distinguish between these situations so we can decide whether to investigate a specific change or make structural improvements to the process.
To make these concepts concrete, we will use the same example throughout the article: an automatic saw that must cut tubes to a nominal length of 100.0 mm, with an LSL of 99.5 mm and a USL of 100.5 mm. We take small samples of parts at different times and analyze both their behavior over time and their distribution.

Practical note on sampling : for the analysis to be representative, we need enough observations and rational subgroups, meaning groups of measurements taken under conditions that are as homogeneous as possible.
As a common guideline, around 20–25 subgroups and approximately 100 observations in total can be used for an initial assessment. Sample size and frequency should be adapted to the process, its speed and the type of Control Chart.
Before interpreting process variability, it is also advisable to check that the measurement system is adequate, since some of the observed variation may come from the measurement system itself (for critical variables, an MSA/Gage R&R study can quantify this contribution).
Using the same process data, we can also examine how the measurements are distributed by plotting a histogram.

Control Charts and distribution answer different questions. Charts preserve time order and are used to detect changes, whereas the histogram or distribution shows how the values are spread. For many continuous variables, it can be useful to model the data using a normal distribution, but not all processes follow this pattern. When they do not, control charts and capability analyses suited to the data type and its distribution should be used.
Common cause vs. special cause variation
- Common (or random) causes: these are sources of variation inherent in the process’s usual operation. While only common causes are present, variability remains statistically stable and predictable within its natural limits. In this case, the process is considered to be under statistical control, or stable. Examples include small differences between cycles, usual raw material variations, minor environmental fluctuations or gradual, predictable tool wear.
- Special (or assignable) causes: these arise when a specific factor alters the process’s usual behavior. They may be due, for example, to broken tooling, an abnormal batch of material, an incorrect setting or abnormal tool wear. Their presence may show up as points outside the control limits or as non-random patterns, such as trends, shifts or runs. A process affected by special causes is considered unstable.
The classification depends on the context: the same source of variation can be common or special. For example, a small variation between raw material batches may be part of the process’s usual behavior, whereas a batch with properties clearly different from the usual ones would be a special cause.
This distinction is critical because each type of variability calls for a different response:
- For a special cause, we must identify what has changed, find its source and eliminate or correct it.
- When variability due to common causes is too high, there is usually no single incident to correct. The production system needs to be improved to reduce its structural variability: machine, method, materials, process conditions, and so on.
Treating common causes as if they were special causes (e.g. adjusting the machine every time a measurement moves slightly away from the mean, even though the process remains under control) is a mistake that can increase variability rather than reduce it. Deming called this tampering, and it is a source of hidden quality losses.

Control Charts: the visual tool of SPC
The main SPC tool is the Control Chart, also known as a Shewhart Control Chart. These charts plot a process variable over time (a dimension, weight, temperature, subgroup mean or subgroup spread, for example) alongside three reference lines:
- CL (Center Line): the value around which we expect the measure plotted on the chart to vary.
- UCL (Upper Control Limit): the upper limit calculated from the process’s usual variability.
- LCL (Lower Control Limit): the lower limit calculated from the process’s usual variability.
Note : In Shewhart Charts, the limits are set at approximately three standard deviations (3σ) of the plotted measure from the center line. The specific formula depends on the chart type (for example, I-MR, X̄-R or X̄-S) and the subgroup size.
In this context:
- μ is the process mean, the value around which the measurements tend to cluster.
- σ is the standard deviation, which measures the spread or variability of the process around its mean. The larger σ is, the greater the variation in the results. The smaller σ is, the more closely the measurements cluster around μ.
Control Limits therefore represent the expected range of process variation when the process behaves in a stable manner. A value outside these limits, or certain non-random patterns within them, may indicate the presence of a special cause.
These Control Limits must not be confused with Specification Limits (USL – Upper Specification Limit and LSL – Lower Specification Limit):
- Specification Limits come from product requirements: the customer, design, regulations or quality plan.
- Control limits are calculated from the data and describe process behavior.
A process can be perfectly stable and still produce out-of-specification output if its natural variability does not fit within the tolerances.
The main advantage of Control Charts is that they can detect changes in the process before these lead to nonconforming products, by identifying statistical signals of change before those variations result in defects in the process output.

💡 Process Stability and Capability: the questions we need to ask
Understanding SPC leads to a fundamental distinction when analysing process quality:
- Is our process stable?
Does its behavior remain statistically predictable over time, or do special causes of variation arise? This question is answered mainly through Control Charts.
- Is our process capable?
Once its stability has been verified, do its variability and centring allow it to produce within specifications with a sufficient margin? This is analyzed using Cp and Cpk.
- How is it actually performing over the period analyzed?
What happens when we consider all the observed variability, including differences between shifts, batches or periods? This is where Pp and Ppk come in.
If the charts show active special causes, the priority is to understand and correct that instability.
A process can be stable but not capable: it behaves predictably, but its distribution does not fit adequately within the tolerances. It may also show good potential capability when within-subgroup variability is analyzed, yet worse overall performance because its conditions change between periods. The aim is to have a stable, capable process with sustained performance over time.

To conclude, and to better understand the difference between stability and capability, we can visualise how both concepts relate to meeting specifications.

From stability to capability: the next step
Verifying that a process is stable is a fundamental condition, but it does not yet tell us whether that process can meet the tolerances with an adequate margin.
To answer that second question, we need to compare the process’s variability and centring with the specification limits. This is where Cp and Cpk come into play and, when we extend the analysis to a sufficiently representative period, Pp and Ppk.
If you want to better understand these metrics, we explain them here: 👇

CTO & TECHNICAL DIRECTOR
Expert in industrial monitoring and data analytics.
We tell you how to improve decision-making and production efficiency in your plant, without wasting time generating reports. Your plant at a glance!
Subscribe to our Newsletter